Piping Works
Crown Steel is specialized in piping and mechanical works: engineering, prefab and on-site construction. Our offering includes maintenance of piping and a variety of installations, with CS, stainless steel, aluminum and other materials. The piping can be in different sizes and in open or confined spaces, as per the space restrictions of the project.
# | Client | Nature of Work | Year |
---|---|---|---|
11 | SAUDI INDUSTRIAL DETERGENTS CO. (SIDCO) | PIPING, PIPE RACK & PIPE SUPPORT @ TANK FARM AREA | 2016 |
12 | CATERPILLAR | ADDITIONAL PIPING WORK FOR DUBBA SITE | 2015 |
13 | TOTAL LUB. | ADDITIONAL TO PIPING WORK. FOR RABIGH SITE | 2015 |
14 | AL HAMRANI FUCHS | PRE-FABRICATION, INSTALLATION & PAINTING OF PIPING & MECHANICAL | 2015 |
15 | ABULJADAYAL EST. | FABRICATED H.D.G PIPES & SS 316L PIPES COMPLETE WITH ASBESTOS GASKETS. | 2010 |
16 | WARTSILA POWER CONT.CO.LTD. | PIPE SUPPORTS FOR AL SAFWA PROJECT. | 2009 |
17 | WARTSILA POWER CONT.CO.LTD. | PIPING WORK + INSTALLATION OF EQUIPMENT FOR AL SAFWA CEMENT PLANT | 2009 |
18 | WARTSILA POWER CONT.CO.LTD. | INSULATION & CLADDING OF EXHAUST GAS DUCT AT AL SAFWA SITE FOR DG-4 & DG-5; REVISED ON 10.06.09; INSTALLATION & CLADDING FOR PIPES, HEAT TRACING FOR PIPE LINE, INSULATION & CLADDING FOR EXHAUST DUCTING FOR DG # 1,2,& 3 | 2009 |
19 | WARTSILA POWER CONT.CO.LTD. | PIPING WORK - RCC EXT. PROJECT RIYADH. | 2009 |
20 | BIOSOLIDAIR | SUPPLY & FAB. OF PIPING WORK FOR THERMAL OIL HEATERS, WET SLUDGE, CONNECTING PIECES. | 2007 |